The bridge was designed with a curve to provide the required 200 feet of clearance needed to allow an empty oil-fired aircraft carrier to pass beneath it – it is not tall enough for Nimitz-class nuclear aircraft carriers.
The bridge was designed with a curve to provide the required 200 feet of clearance needed to allow an empty oil-fired aircraft carrier to pass beneath it – it is not tall enough for Nimitz-class nuclear aircraft carriers.