During its 20-year operating life, shortened by dieselization, No. 227 hauled approximately 40 million long tons of iron ore from the mines on the Mesabi and Vermillion Ranges to the docks at Duluth and Two Harbors.
During its 20-year operating life, shortened by dieselization, No. 227 hauled approximately 40 million long tons of iron ore from the mines on the Mesabi and Vermillion Ranges to the docks at Duluth and Two Harbors.